Paul Keating Park Civic Precinct Upgrade — Bankstown NSW | Auswave Products

1. Stakeholders

This project was delivered in collaboration with Pat Morrell Plumbing / Bankstown Council. Auswave Products was engaged to supply curved drain access covers, precision-fabricated to meet the project’s exacting performance, hygiene, and aesthetic requirements.

With over 20 years of experience delivering bespoke stainless steel drainage solutions for Australia’s most demanding projects, Auswave brought the technical expertise and fabrication capability required to deliver an outstanding result.

2. Location

Project Location: Bankstown, NSW

3. Property / Development Type

This project involved the supply of curved drain access covers for the Paul Keating Park Civic Precinct Upgrade, requiring precision-fabricated, Australian-made stainless steel drainage solutions engineered to perform in a demanding built environment.

4. Property Description

The Paul Keating Park Civic Precinct Upgrade is a significant Australian project that required drainage infrastructure meeting the highest standards of performance, durability, and aesthetic quality.

The project’s scope demanded curved drain access covers fabricated to exact specifications — a challenge that Auswave Products was uniquely positioned to meet through its precision custom fabrication capability and 20+ years of industry experience.

5. Reason Engaged

Auswave Products was engaged by Pat Morrell Plumbing / Bankstown Council to supply curved drain access covers for this project.

The selection of Auswave reflects the project team’s confidence in Auswave’s ability to deliver precision-fabricated, Australian-made drainage solutions that meet the exacting standards of a project of this calibre.

Relevant solutions:

6. Initial Assessment

Key drainage challenges identified during the initial project assessment:

  • Product specification — curved drain access covers fabricated to exact project specifications
  • Australian Standards compliance — all products specified to meet relevant Australian Standards
  • Durability — grade 316 stainless steel specified for long-term performance
  • Aesthetic integration — products designed to complement the project’s design language
  • Accessibility compliance — heelguard and slip-resistant profiles specified where required
  • Programme coordination — fabrication and supply coordinated with the construction programme

7. Description of Work Performed

Auswave Products supplied curved drain access covers for the Paul Keating Park Civic Precinct Upgrade, precision-fabricated in grade 316 stainless steel to Australian Standards.

Auswave custom stainless steel access covers and frames — Australian made civil drainage

Key Products and Solutions Supplied:

  • Auswave Products — curved drain access covers precision-fabricated for Paul Keating Park Civic Precinct Upgrade
  • Curved Drain Access Covers — precision-fabricated to project specifications
  • Civil Drainage Solutions — engineered to manage water effectively
  • Heelguard Compliant Profiles — slip-resistant profiles to Australian Standards
  • Custom Fabrication — all products fabricated to exact project dimensions

8. Considerations

  • Material specification — grade 316 stainless steel for superior corrosion resistance
  • Safety and accessibility — profiles meeting Australian Standards for public safety
  • Hygiene performance — smooth, non-porous surfaces for thorough cleaning
  • Aesthetic integration — products complementing the project’s architectural language
  • Load rating compliance — products fabricated to appropriate load ratings
  • Long-term value — Australian-made products specified for maximum service life

9. Duration

Auswave Products’ fabrication and supply scope for Paul Keating Park Civic Precinct Upgrade was coordinated with Pat Morrell Plumbing / Bankstown Council’s construction programme to ensure all products were delivered on schedule and ready for installation.

10. Maintenance

Recommended maintenance for Paul Keating Park Civic Precinct Upgrade drainage infrastructure:

  • Regular inspection for debris accumulation and cleaning as required
  • Periodic cleaning with appropriate stainless steel cleaner to maintain finish
  • Annual inspection of grate seating and frame integrity
  • Post-storm inspection to clear debris and assess drainage performance
  • Planned maintenance review as part of the asset’s ongoing maintenance programme

11. Client / Stakeholder Feedback

The Paul Keating Park Civic Precinct Upgrade project has been recognised as a significant achievement — delivering curved drain access covers that met the project’s exacting standards for performance, durability, and aesthetic quality.

Pat Morrell Plumbing / Bankstown Council’s engagement of Auswave Products reflects the confidence that Australia’s leading builders, contractors, and asset owners place in Auswave’s precision fabrication capability and product quality.

12. Future Recommendations

  • Ongoing maintenance — proactive maintenance of curved drain access covers will maximise service life
  • Product upgrades — future works should specify Auswave’s current product range
  • Drainage review — periodic review ensures continued performance
  • Accessibility compliance review — review specifications as Australian Standards evolve
  • Auswave partnership — preferred drainage supplier for any future works at this project

Auswave Products

Australian-made drainage solutions, engineered to perform.

With over 20 years of experience delivering precision drainage for Australia’s most demanding projects.

Learn more: auswave.com.au/civil/

Too many entries. Please call if you have any questions.

null

AUSSIE MADE.
GUARANTEED TO BE THE BEST YOU CAN OWN​.

CALL US: 1300 783 632

STANDARD SPECS

Wheelchair compliant AS1428.2 (part 2 clause 9C)

Cycle safe AS 3996 (clause 3.3.6)

Scroll to Top